Active Mission & Market Pathways

Real problems, moving through a disciplined pathway.

Each one is described by market, mission problem, application and stage, without naming the organization.

Active
6
Markets
3
01 — Active Now

Where each effort sits on the eight steps.

Each entry also carries a maturity label.

  1. 01Identify: 0 pathways
  2. 02Assess: 3 pathways
  3. 03Demonstrate: 1 pathway
  4. 04Measure: 2 pathways
  5. 05Validate: 0 pathways
  6. 06Capture: 0 pathways
  7. 07Deploy: 0 pathways
  8. 08Scale: 0 pathways
6 pathways
HEMTT M978 fuel tanker on the road

Defense

2 pathways

Reducing fuel demand and logistics burden, and extending operational endurance.

In development · 2

  • Mission pathway development

    Defense sustainment / operational endurance

    Mission pathway development

    Defense use cases centered on reducing fuel demand and logistics burden. Controlled generator-based use cases, measurable evaluation concepts, capability packaging, and sustainment and acquisition pathways.

    Stage 02 · Assess
  • Pathway development

    Air Force installation & operational energy

    Mission pathway development

    Generator, operational-energy and installation-resilience applications, with the mission problem and a credible evaluation pathway established before any capability claim.

    Stage 02 · Assess

Commercial

3 pathways

The same engines at work in fleets, heavy-duty equipment and power generation.

In the field · 2

  • Field validation

    Heavy-duty / energy operations

    Operational evidence

    Continued field evaluation in a demanding heavy-duty environment. Mileage and fuel-use information is being collected before any performance conclusion is drawn.

    Stage 04 · Measure
  • Field deployment

    Commercial trucking

    Field deployment

    A hydrogen-on-demand capability operating in a commercial trucking environment, with field and performance information being collected while the installation and support process is refined.

    Stage 04 · Measure

In development · 1

  • Application development

    Power generation / data centers

    Application development

    Evaluation of a natural-gas generator application: technical integration, design and controlled-test planning before any commercial claim or scaling decision.

    Stage 03 · Demonstrate
Stacked artillery munitions

Precision

1 pathway

Precision fires and operations where satellite navigation is degraded, run separately from the endurance work.

In development · 1

  • Mission use-case development

    Precision fires & alternative navigation

    Mission pathway development

    Operational use cases for an industry technology for GPS-denied and GPS-degraded environments: employment concepts, stakeholder engagement, and modeling, simulation and evaluation pathways. Kept separate from the endurance portfolio.

    Stage 02 · Assess

DFGD distinguishes among market engagement, prospective opportunities, pilots and demonstrations, customer-reported results, validated performance, contractual relationships, and deployments. Public information is presented according to the documented and approved stage of each effort and should not be interpreted as endorsement by organizations associated with DFGD market-development activities.

Demonstrations & pilots In documentation now

Design a pilot with us.

Bring the platform and the problem. We scope the demonstration, the baseline and the measurement protocol with you.

Engage DFGDDemonstrations & pilots